Value Case
Value Case
Read Value Case: templates guidance with evidence limits, practical checks and editable source material.
Outcome contract
The referenced workflow-charter.json is authoritative for shared workflow, segment, owner, outcome, verifier, baseline, target, attribution, and guardrail fields. Record a charter change there first, then synchronize this planning model and update the timestamp below. illustrative_fixture is reserved for the repository's canonical JSON example and must be replaced with unmeasured, estimated, or measured in an engagement artifact.
| Field |
Value |
| Workflow-charter URI |
— |
| Workflow-charter version |
— |
| Last synchronized at |
— |
| Workflow and eligible segment |
— |
| Operational owner |
— |
| Accepted outcome |
— |
| Independent verifier |
— |
| Primary metric and direction |
— |
| Baseline status: unmeasured, estimated, or measured |
— |
| Baseline value, date, source, and denominator |
— |
| Target and measurement window |
— |
| Attribution method |
— |
| Guardrail metrics |
— |
Assumption model
| Input |
Low |
Expected |
High |
Evidence and owner |
| Annual eligible volume |
— |
— |
— |
— |
| Adoption rate |
— |
— |
— |
— |
| Accepted-outcome uplift |
— |
— |
— |
— |
| Value per accepted outcome |
— |
— |
— |
— |
| Annual avoided loss |
— |
— |
— |
— |
| Annual expected residual loss not already netted from unit value or avoided loss |
— |
— |
— |
— |
| One-time implementation and change cost |
— |
— |
— |
— |
| Annual fixed operating cost |
— |
— |
— |
— |
| Variable model, tool, compute, storage, retry, and wait cost per eligible run |
— |
— |
— |
— |
| Human review and recovery cost per eligible run |
— |
— |
— |
— |
annual_gross_realized_value =
eligible_volume
× measured_adoption_rate
× accepted_outcome_uplift
× value_per_accepted_outcome
+ measured_avoided_loss
annual_net_value_before_system_cost =
annual_gross_realized_value
- residual_loss_adjustment
residual_loss_adjustment =
0 when the exposure is already netted from unit value or avoided loss
otherwise separately attributed residual or incremental harm
annual_variable_cost =
eligible_runs
× (variable_system_cost_per_eligible_run
+ human_review_and_recovery_cost_per_eligible_run)
steady_state_annual_net_value =
annual_net_value_before_system_cost
- annual_variable_cost
- annual_fixed_operating_cost
year_one_net_value =
steady_state_annual_net_value
- one_time_implementation_and_change_cost
payback_months =
one_time_implementation_and_change_cost
/ positive_steady_state_monthly_net_value
Do not calculate payback when steady-state monthly net value is zero or negative. Avoided loss is a measured reduction from the baseline; subtract residual loss separately only when it represents harm not already netted from avoided loss or unit value. For one loss class, use either gross exposure minus residual loss or net avoided loss—never both. If residual loss is unmeasured, keep it null, lower confidence, and do not claim a complete net-value result. Keep one-time, fixed, variable-system, and human-review/recovery costs mutually exclusive and state the currency, period, and allocation method.
Evidence gates
| Gate |
Evidence |
Threshold |
Owner |
Status |
| Problem materiality |
Current-state baseline |
— |
Operational |
— |
| Technical feasibility |
Representative replay and effect verification |
— |
Technical |
— |
| Operator acceptance |
Reviewed cases and usability evidence |
— |
Product/operations |
— |
| Adoption |
Eligible use, completion, override, abandonment |
— |
Operational |
— |
| Business value |
Attributed accepted-outcome movement |
— |
Metric owner |
— |
| Economics |
Full cost per accepted outcome and payback |
— |
Sponsor/finance |
— |
| Production readiness |
Release, support, recovery, ownership |
— |
Service/risk |
— |
Sensitivity and disconfirming evidence
| Assumption |
Result if wrong |
Earliest signal |
Stop or redesign threshold |
| — |
— |
— |
— |
Decision
Record discover, pilot, defer, do_not_build, promote, pause, or retire, with the evidence date, approvers, limitations, and next review.