Worked Adoption and Handoff Plan

Worked Adoption and Handoff Plan

Read Worked Adoption and Handoff Plan: invoice practice guidance with evidence limits, practical checks and editable source material.

This record is intentionally incomplete. It shows what must be fixed before a pilot begins and what the receiving team must exercise before delivery-team exit. No exercise below has been run in a customer environment.

Adoption contract to freeze before pilot entry

Field Predeclared definition
Eligible denominator Domestic price-variance exceptions meeting policy revision 8 and source-quality requirements; exclude duplicate, cross-tenant, payment-execution, and unsupported-policy cases
Exposure Eligible case rendered in the persistent review queue with cited evidence
Completion Reviewer approves, edits, rejects, or explicitly escalates the proposal
Accepted outcome Approved correction matches ledger readback and the verified proposal digest
Target At least 60% of eligible cases exposed and 80% of exposed cases independently accepted in the named pilot window
Guardrails Zero prohibited or unverified effects; correction or rejection below 20%; abandonment below 10%; reviewer wait and support load within named capacity
Sources Queue eligibility query, review-surface events, approval record, effect receipt, ledger readback, support queue, and time study—each with a fixed revision
Owner Accounts-payable service owner; finance controls manager verifies acceptance

The actual target dates, source queries, event schemas, timezone, late-event policy, identity-deduplication rule, baseline status, and reviewer-capacity limit remain open. That blocks pilot entry.

What the adoption path would have to prove

The current process starts in the manual exception queue. The proposed path adds a persistent review surface that assembles cited evidence and a staged correction while leaving approval and posting with the designated reviewer. That may help, but the fixture has not shown that an operator can find the right case, trust the evidence, complete the review faster, recover from a bad proposal, or obtain support.

Funnel stage Required target evidence Current evidence state
Eligible opportunity Versioned query for domestic price-variance exceptions under policy revision 8, with declared exclusions No target query or observed population
Exposed in the review surface Event proving an eligible case was rendered to an authorized reviewer with cited evidence No implemented target surface or event
Completed or dispositioned Reviewer approves, edits, rejects, or escalates; abandonment and reason are recorded No target users or interaction evidence
Independently accepted Approved correction matches proposal digest and ledger readback Deterministic fixture cases only; no customer acceptance
Verified business effect Matched time study and downstream rework check Illustrative forecast only
Sustained net value Accepted effect minus reviewer, support, assurance, incident, and operating cost No pilot or production window

Friction hypotheses to test

These are test questions, not findings:

  • Access and routing: can the designated reviewer reach the right eligible case through the normal workday path without a delivery-team workaround?
  • Evidence and trust: does the packet show the invoice, purchase order, policy revision, missing facts, and proposed change clearly enough to support a decision?
  • Action safety: can the reviewer edit, reject, escalate, pause, and resume while the manual queue remains available?
  • Workday benefit: does the surface reduce handling time or rework without moving hidden verification and support work to the reviewer?
  • Capacity: can the review and support owners handle the proposed cohort's peak queue, wait, correction, and escalation load?

How a pilot result would be diagnosed

This table is predeclared planning logic. It contains no observed pilot result.

First weak transition Initial interpretation Bounded response
Eligible -> exposed Eligibility query, integration, access, routing, latency, or source quality is wrong Repair the path or narrow the segment; do not call it user resistance
Exposed -> completed Surface placement, evidence, timing, training, or fallback is wrong Observe cases and repair the workflow before adding users
Completed -> accepted Proposal quality, evidence sufficiency, policy, or authority is wrong Repair context, mechanism, evaluation, or boundary
Accepted -> business effect The bottleneck, baseline, or attribution model is wrong Revisit the value case or stop
Effect -> sustained net value Review, support, incident, or operating cost is too high Constrain the cohort, redesign operation, or stop

Receiving-team exercises

Capability Required demonstration Current state
Explain scope and limits Receiving owner leads a review of the recommendation-only boundary Not run
Reproduce adoption Run numerator, denominator, exclusions, and guardrail queries from authoritative sources Not run
Enable a representative cohort Receiving team owns access, training, support, and the first-use path Not run
Diagnose one adoption break Use representative cases and reason codes to assign the owning layer and response Not run
Add an evaluation case Author one representative exception and one negative authority case Not run
Release and rollback Promote an isolated compatible candidate and restore the prior release Not run
Contain and reconcile Use the kill switch, identify affected effects, and verify ledger state Not run
Support an operator Resolve a pilot support case and classify the learning Not run
Retire the service Tabletop identity, tools, schedules, state, evidence, users, and manual fallback Not run

Exit decision

handoff_blocked. Documentation and passing fixture tests are not exercised operating capability. The delivery team must not exit into a production handoff, and the service must not claim bounded production, until the receiving team leads the required paths with inspectable evidence.